The Starting Point:
Conventional mould for plastic injection moulding
The tool used to date comprises mould inserts, mould plates, mounting plates and standardised components. It measures around 125 x 125 x 130 mm (width x length x height) and weighs approximately 60 kilograms. The objective of the project was to improve the injection moulding process in terms of its cycle time, to make the unit less complex and to simplify the development process. Here, we benefited from our long-standing expertise in additive manufacturing. The considerable flexibility offered by 3D metal printing meant that the design engineer could completely reconfigure the insert and improve its topology in line with the specific loads and requirements. The result was a brand new mould – smaller, lighter and with integrated conformal cooling.
The Challenge:
Functionality preserved
Certain surfaces had to be retained during the topology optimisation process in order to preserve the functionality of the mould. Special requirements, such as the need for both parts to fit together precisely, the position of the ejector and the connectors for the machine's peripherals, had to be taken into account when optimising the topology. Options for later clamping the mould for reworking in a CNC machining centre also had to be considered during the design stage. In order to make full use of the technological advantages of additive manufacturing, functional surfaces, such as a conformal cooling channel with an optimised cross-sectional area, were integrated into the blank. A further challenge was the warping of components during the 3D metal printing process. Arranging the components in the best way possible and creating the necessary supports require an in-depth understanding of the process as well as experience in preparing data for additive manufacturing. This also has a strong influence on component warping. With the support of integrated process simulation, this warping can be calculated quickly and efficiently. This allows unwanted rejected components or disruptions in the construction process to be avoided from the outset. The "first time right" principle is an important indicator for the technological maturity of additive manufacturing and is especially crucial for industrial applications.
The Approach:
End-to-end process with Siemens NX
- Redesign of the mould
- Extraction of functional surfaces and specification of framework conditions
- Choice of materials
- Integration of conformal cooling
- Topology optimisation
- Verification using FEM calculations, cooling simulation
- Data processing for 3D metal printing
- Simulation of the printing process
- Production (3D printing) and finishing (heat treatment, removal of supporting structure, surface treatment)
- Reworking using machining methods and quality control (optical, tactile)
- Use in injection moulding machine and production of components
The results:
A first step towards the future of mould making
The new and improved 3D-printed mould has much smaller dimensions. The original unit comprising several individual components has been reduced to a mould half. The optimised tool therefore weighs almost 50% less than its predecessor. The low weight means that less mechanical power is required and makes the mould easier to assemble into the injection moulding machine. At the same time, the tool is much higher performing despite the shorter development period. The lower mass and the conformal cooling reduces the cycle time by 30%, while ensuring that the component quality remains the same.